Skip to main content

Table 3 Floor and ceiling effects in PROMIS and legacy instruments

From: Patient-reported outcomes measurement information system instruments in knee arthroplasty patients: a systematic review of the literature

Author

N

Procedure

PROMIS domain

Timepoint

Floor (%)

Ceiling (%)

Khalil et al. [19]

875

TKA

PROMIS GPH

NR

0

0

Austin et al. [21]

217

TKA

PROMIS GPH

Preoperative

 < 0.1

0

PROMIS GPH

(1–90 days)

0

 < 0.1

PROMIS GPH

(270–365 days)

0

1.60

PROMIS GMH

Preoperative

 < 0.1

5.60

PROMIS GMH

(1–90 days)

 < 0.1

6.20

PROMIS GMH

(270–265 days)

0

7.20

KOOS-JR

Preoperative

1

0.20

KOOS-JR

(1–90 days)

 < 0.1

0.90

KOOS-JR

(270–265 days)

1

4.80

M-SANE

Preoperative

4

1.00

M-SANE

(1–90 days)

0

0.90

M-SANE

(270–265 days)

0

11.30

Lawrie et al. [31]

172

TKA, BPCI

PROMIS PF

Preoperative

0

0

PROMIS PF

12 months

0

0

PROMIS PI

Preoperative

0

0

PROMIS PI

12 months

20

0

Depression

Preoperative

13

0

Depression

12 months

38

0

TKA, non-BPCI

PROMIS PF

Preoperative

0

0

PROMIS PF

12 months

0

0.50

PROMIS PI

Preoperative

0

0

PROMIS PI

12 months

14

0

Depression

Preoperative

21

0

Depression

12 months

38

0